Import status
40 people · 12 teams · 12 milestones · 161 dependency links
Jira
285 issues- ATL-2041 Vendor delivery: Act II combat animation pack (batch 3)
- ATL-2077 Boss encounter 'The Warden': integrate final animations
- ATL-1988 Act II cinematic sequence previs to final
- ATL-2080 Warden encounter QA pass
Slack
54 threads- #vendor-kestrel Heads up: batch 3 mocap cleanup is running behind. Two of our animators are out. Realistically we're looking at 12 more days.
- #narrative Playtest feedback on Quest 12 was rough. Proposing we restructure the second half: the archive flooding reveal moves earlier.
- #vo-production Studio time before VO Lock is fully booked. Any big change now means pickups, and the Quest 12 cast is thin until mid-November.
- #eng-leads Save system work on stash is blocked until someone owns inventory v2. Still unassigned?
Confluence
20 pages- Alpha Definition and Exit Criteria
- Kestrel Studios Statement of Work
- Quest 12 The Drowned Archive: Design Doc v4
- VO Pipeline and Lock Policy
Perforce
46 changelists- CL 884213 Q12 v4 beat restructure: placeholder dialogue nodes
- CL 884502 Photo mode: LUT filter pipeline
- CL 884517 DoF slider and bokeh shape
- CL 883990 Save: stub stash serialization (blocked on inventory schema)
Analysis
- Reading Jira export
- Reading Slack history
- Reading Confluence spaces
- Reading Perforce metadata
- Linking entities across sources
- Tracing critical path to Alpha
- Scoring risks